FINANCIAMENTO DISPONÍVEL
Turbo-hélice King Air C90B com muitas horas disponíveis de motor
Motores receberam upgrade com o Kit Blackhawk
Programa de acompanhamento de manutenção – CAMP
Programa de monitoramento de parâmetros de motor e aeronave – Jet Care Trend Monitoring
Equipado com Garmin G600
Aeronave bem mantida
Configurado com 8 assentos
Pronto para entrega
Pronto para o trabalho
Status de Inspeção
Phase 1 Inspection- Completed 03/2025 by Turbine Aircraft Services- PWA
Phase 1 through 4 Inspections- Completed 06/2024 by Turbine Aircraft Services- PWA
FAR 91.411/ 91.413 Pitot/ Static Inspections- Completed 14/SEP/2023
6- Year/ 8,000 Cycle Major Landing Gear Inspection- 07/JUL/2023
Prop strike incident when landing 06/2022. Airframe inspected, right engine inspected and right prop replaced